THE GENIUS PROJECT
Hub Week 1 Week 2 Week 3 Week 4 Final Quiz
Monday · Virtual · 10:00 AM

Solving Problems with AI

Tackle real-world problems with smart solutions. We lock in each team's problem statement, choose the model type, and plan the build.

Wednesday · In Person · 10:00 AM

Rocket Competition

Design. Build. Launch. Win. Engineering under pressure, exactly the energy you need for the Buildathon.

Friday · Virtual · 10:00 AM

Building Your AI Solution

Finalize and improve your AI solution with mentor feedback. This is your last working session before showcase week.

Mini Game The AI Builder's Pipeline

Every real AI project follows the same six steps, whether it is a flood model or a hit-song predictor. This is the exact pipeline your Buildathon project should follow.

How to play
  1. Read the six white step cards in the pile below. They are shuffled.
  2. Press and hold a card, then drag it into a numbered slot: Step 1 is what you do first, Step 6 is last. On a phone, drag with your finger.
  3. Dropping a card on a full slot swaps the old card back into the pile.
  4. When all six slots are filled, press Check my pipeline. Fix any coral cards and check again.

📬 Week 4 Assignments (Mission Days)

1. One-slide pitch (Tuesday). Make a single slide: the problem, who it hurts, which model type you chose (from the Week 2 five), and how your AI helps. If your granny cannot understand the slide in 30 seconds, simplify it.

2. Test with a real user (Thursday). Show your solution to one person outside the program. Write down the first question they ask; that question is your weakest point, fix it before Friday.

3. Final flood score (weekend). Last chance to top the flood prediction leaderboard before showcase week. 🏆 Top score wins a prize

Final run: Flood Prediction quest → Submit your final score →